| 000 | 01293cam a22003011 4500 | ||
|---|---|---|---|
| 001 | sa 68014307 | ||
| 003 | DLC | ||
| 005 | 20260227112630.0 | ||
| 008 | 850917s1964 ii ab s000 0 eng | ||
| 010 | _asa 68014307 | ||
| 025 | _aPL480:I-E-10425 | ||
| 035 | _a(OCoLC)12566708 | ||
| 040 |
_aDLC _cHU _dHU _dDLC |
||
| 042 | _apremarc | ||
| 043 | _aa-ii--- | ||
| 050 | 0 | 0 |
_aTC558.I42 _bT56 |
| 082 | _a627/.81/095413 | ||
| 110 | 1 |
_aOrissa (India) _bIrrigation and Power Department. |
|
| 245 | 1 | 0 | _aReport on Tikerpara Dam project, 1964. |
| 260 |
_a[Bhubaneswar, _c1964] |
||
| 300 |
_aix, 191, cvi p. _billus., fold. maps (part col., 1 fold. col. in pocket) _c30 cm. |
||
| 500 | _a"The report on the civil works has been prepared by the Irrigation Branch and the report on the electrical works has been prepared by the Electrical Projects Organisation of the Irrigation & Power Dept." | ||
| 500 | _a"Orissa's decade of destiny 1963-73; a plan for the integrated development of the river basins of Orissa, by A.N. Khosla": 31 p. (in pocket with fold. col. map) | ||
| 651 | 0 | _aTikerpara Dam (Proposed) | |
| 650 | 0 |
_aHydroelectric power plants _zIndia _zMahanadi River. |
|
| 700 | 1 | 2 |
_aKhosla, Ajudhia Nath, _d1892- _tOrissa's decade of destiny 1963-73. |
| 740 | 0 | _aTikerpara Dam project. | |
| 999 |
_c85682 _d85682 |
||